Skip to content

EB-GenMade in Nandanam, Chennai

Swift EB-Gen automatic changeover

EB fails, the load moves to your generator. EB returns, it moves back.

Price on requestRates change from time to time. We quote on WhatsApp or by phone.

Swift EB-Gen automatic changeover front panel, 60 A, EB phase 3, Gen phase 3, red rating plate and indicator lamps

With a generator, someone has to move the changeover switch by hand. The Swift EB-Gen automatic changeover does this by itself.

When EB supply fails, it moves your load to the generator supply. When EB returns, it moves the load back.

There are three versions. Each one matches your EB supply and your generator.

Tell us your generator's kVA and phases. We will match the version and rating.

Fit by a licensed electrician, after the EB meter.

  • Swift EB-Gen automatic changeover front panel with Swift badge, three indicator LEDs and red rating plate
  • Swift EB-Gen changeover with the cover off, showing contactors, indicator board and GEN INPUT and GEN IGNITION terminals
  • Swift EB-Gen changeover with the cover off, showing two contactors, indicator board and a row of terminals

Pick the version

Versions

Versions: Swift EB-Gen automatic changeover
VersionEB supplyGeneratorQuote
EB-Gen (single phase)Swift EB-Gen automatic changeover, single phaseSingle-phaseSingle-phase

Price on request

Ask on WhatsApp about Swift EB-Gen automatic changeover, single phase
EB3-GEN1Swift EB3-GEN1 automatic changeoverThree-phaseSingle-phase

Price on request

Ask on WhatsApp about Swift EB3-GEN1 automatic changeover
EB3-GEN3Swift EB3-GEN3 automatic changeoverThree-phaseThree-phase

Price on request

Ask on WhatsApp about Swift EB3-GEN3 automatic changeover

Datasheet

Specifications

Specifications: Swift EB-Gen automatic changeover
On EB failureChanges over to generator supply
When EB returnsChanges back to EB
VersionsSingle phase, EB3-GEN1, EB3-GEN3
RatingsTo match your generator; ask us

Model

EB-Gen

Need a size, a drawing or a wiring question answered? WhatsApp us the model.

Ask on WhatsApp

5 questions

Questions buyers ask

Which version do I need?

Match it to your supply. Single-phase EB and generator: the single-phase EB-Gen. Three-phase EB with a single-phase generator: EB3-GEN1. Three-phase EB and generator: EB3-GEN3.

What happens when EB fails?

The load moves to the generator supply. When EB returns, the load moves back to EB. You do not move a switch by hand.

Does it control the generator itself?

It handles the changeover between EB and generator. Generator start depends on your set. Tell us the generator make and kVA. We will advise.

I have three-phase EB but a single-phase generator. Will it work?

Yes. The EB3-GEN1 is made for that: three-phase EB with a single-phase generator.

What size do I need?

It depends on your generator and your load. WhatsApp us the generator's kVA and phases. We will confirm the rating.

Price on request

Ask for a quote

Swift EB-Gen automatic changeover: WhatsApp the model and your area, or call. We reply Mon–Sat, 10:00 to 18:00.

Price on requestRates change from time to time. We quote on WhatsApp or by phone.