APFCMade in Nandanam, Chennai
Eltech Energy APFC panel (AEE series)
Hold PF at 0.85 or above, so the PF penalty stops.
- Range
- 4.5 to 150 kVAR
- Stages
- 5 to 18
- Switching
- Contactors
- Target PF
- Up to 0.99 lag
Price on requestRates change from time to time. We quote on WhatsApp or by phone.

A PF rule covers three-phase LT III-B and LT V services. They must keep PF at 0.85 or above. Below that, the EB bill carries a PF penalty. The rule is in TNERC Tariff Order No. 6 of 2025.
Eltech Energy APFC panels (AEE series) switch capacitor stages with your load. A microcontroller with a dot-matrix display controls the stages. Standard panels aim for PF up to 0.99 lag.
Panels run from 4.5 to 150 kVAR, in 5 to 18 stages. Contactors switch each stage. For unbalanced loads, we offer phase-wise fine correction.
Welding panels are custom-built for your machines. The panel removes the PF penalty. It does not cut the units (kWh) you use.
Fit by a licensed electrician, after the EB meter.
Pick the version
Versions
| Version | Details | Quote |
|---|---|---|
| APFCEltech Energy APFC panel (AEE series) | 4.5 to 150 kVAR, 5 to 18 stages, contactor-switched. | Price on request Ask on WhatsApp about Eltech Energy APFC panel (AEE series) |
| APFC-WELDAPFC panel for welding machines | Custom-built for your machines. Send your machine list for a quote. | Price on request Ask on WhatsApp about APFC panel for welding machines |
| APFC-FINEAPFC panel with phase-wise fine correction | For unbalanced loads, where single-phase machines sit on different phases. | Price on request Ask on WhatsApp about APFC panel with phase-wise fine correction |
Datasheet
Specifications
| Range | 4.5 to 150 kVAR |
|---|---|
| Stages | 5 to 18 |
| Switching | Contactors |
| Controller | Microcontroller with dot-matrix display |
| Target PF, standard panels | Up to 0.99 lag |
| Unbalanced loads | Phase-wise fine correction |
| Welding machines | Custom-built panels |
| Warranty | 1 year |
| Serial number | On every unit |
Work it out first
Model
AEE series
Need a size, a drawing or a wiring question answered? WhatsApp us the model.
Ask on WhatsApp6 questions
Questions buyers ask
01What is the PF penalty on my EB bill?
A PF rule covers three-phase LT III-B and LT V services. They must keep PF at 0.85 or above. Below 0.85, it costs 1% of current consumption charges per 0.01. Below 0.75, it is 1.5% for every 0.01, counted from 0.85: PF 0.74 costs 16.5%. The rule is in TNERC Tariff Order No. 6 of 2025.
02I fitted a capacitor. Why do I still pay a penalty?
A fixed capacitor suits one load level. When machines start and stop, the PF moves. An APFC panel switches stages to follow your load. Send us your EB bill. We will show where your PF goes.
03Will an APFC panel cut my units?
No. It removes the PF penalty. The units (kWh) your machines use stay the same.
04What size panel do I need?
Use the kVAR calculator, or send us your EB bill. Panels run from 4.5 to 150 kVAR, in 5 to 18 stages.
05Do you make panels for welding machines?
Yes. Each welding panel is custom-built for your machines. Send us your machine list and an EB bill. We will quote for your setup.
06My machines are single-phase, on different phases. Can you correct that?
Yes. Phase-wise fine correction handles unbalanced loads. It corrects each phase for its own load.
Price on request
Ask for a quote
Eltech Energy APFC panel (AEE series): WhatsApp the model and your area, or call. We reply Mon–Sat, 10:00 to 18:00.
Price on requestRates change from time to time. We quote on WhatsApp or by phone.
Also made by Eltech Energy
Related products
APSCSwift APSC automatic phase sequence corrector
Phase order reversed? The lift keeps running.
See details



